Concrete Calculator

Cubic yards of concrete and number of premix bags for a slab.

Enter details

ft
ft
in
%

Concrete needed

1.36 yd³

Cubic feet
36.67 ft³
Cubic meters
1.038 m³
80 lb bags
62
60 lb bags
82

How concrete needed changes with

Length: 5 ft → 0.68 yd³15 ft → 2.04 yd³

The dot is your current value. The graph updates as you type.

Formula: Volume = length × width × depth; 80 lb bag ≈ 0.60 ft³, 60 lb ≈ 0.45 ft³

Comparison: Extra for waste

Extra for wasteConcrete neededCubic feetCubic meters
8%1.33 yd³36 ft³1.019 m³
9%1.35 yd³36.33 ft³1.029 m³
10%1.36 yd³36.67 ft³1.038 m³
11%1.37 yd³37 ft³1.048 m³
12%1.38 yd³37.33 ft³1.057 m³

Concrete Calculator: Yards, Bags & Slab Formula

Short answer

The Concrete Calculator determines the total volume of concrete required for a project in cubic yards, cubic feet, and cubic meters, along with estimated bag counts. For a standard 10 ft by 10 ft slab at 4 inches thick with a 10% waste allowance, you need 1.36 cubic yards of concrete, which equals approximately 62 eighty-pound bags or 82 sixty-pound bags.

Formula

Volume (ft³) = Length (ft) × Width (ft) × (Thickness (in) / 12) × (1 + Waste% / 100) Volume (yd³) = Volume (ft³) / 27 80 lb Bags = Ceiling(Volume (ft³) / 0.60) 60 lb Bags = Ceiling(Volume (ft³) / 0.45)

Length (ft) is the total linear span of the pour in feet. Width (ft) is the horizontal dimension perpendicular to length in feet. Thickness (in) is the depth of the pour in inches, divided by 12 to convert to feet. Waste% is the contingency buffer (typically 5% to 10%) to account for grade variations, spillage, and form deflection. 27 represents the number of cubic feet in one cubic yard. 0.60 ft³ is the average cured yield of a standard 80 lb bagged premix, while 0.45 ft³ is the yield for a standard 60 lb bag.

Worked example

Length
10
Width
10
Thickness
4
Extra for waste
10
  • Concrete needed: 1.36 yd³
  • Cubic feet: 36.67 ft³
  • Cubic meters: 1.038 m³
  • 80 lb bags: 62
  • 60 lb bags: 82

What the Concrete Calculator Computes

The Concrete Calculator simplifies residential and light commercial masonry planning by determining exact volume requirements. It takes length, width, slab thickness, and a waste margin to output:

  • Cubic Yards (yd³): The standard measurement unit used by ready-mix concrete suppliers.
  • Cubic Feet (ft³) and Cubic Meters (m³): Helpful metrics for smaller mixing setups or international project plans.
  • Bag Counts: The exact number of 80 lb and 60 lb pre-blended dry concrete bags required to fill the specified volume.

This tool is designed for homeowners, DIY builders, landscapers, and general contractors planning projects such as sidewalk repairs, patio slabs, shed pads, and shallow foundations.


Step-by-Step Worked Example

Consider a standard backyard patio slab measuring 10 feet long, 10 feet wide, and 4 inches thick, with a 10% waste buffer.

1. Convert Thickness to Feet

Because length and width are measured in feet, depth must match: $$\text{Depth} = \frac{4\text{ in}}{12\text{ in/ft}} = 0.3333\text{ ft}$$

2. Calculate Base Volume

$$\text{Base Volume} = 10\text{ ft} \times 10\text{ ft} \times 0.3333\text{ ft} = 33.333\text{ ft}^3$$

3. Factor in Waste Allowance (10%)

$$\text{Total Cubic Feet} = 33.333 \times \left(1 + \frac{10}{100}\right) = 36.67\text{ ft}^3$$

4. Convert to Cubic Yards and Meters

$$\text{Cubic Yards} = \frac{36.67\text{ ft}^3}{27} = 1.36\text{ yd}^3$$ $$\text{Cubic Meters} = 36.67 \times 0.0283168 = 1.038\text{ m}^3$$

5. Calculate Pre-Mix Bags

Standard yields are 0.60 ft³ for an 80 lb bag and 0.45 ft³ for a 60 lb bag: $$\text{80 lb Bags} = \lceil \frac{36.67}{0.60} \rceil = \lceil 61.11 \rceil = 62\text{ bags}$$ $$\text{60 lb Bags} = \lceil \frac{36.67}{0.45} \rceil = \lceil 81.48 \rceil = 82\text{ bags}$$


Interpreting Your Results

  • Under 1 Cubic Yard (~1 to 40 bags): Practical for on-site mixing using a wheelbarrow or a portable rental drum mixer. Bagged concrete gives you scheduling flexibility.
  • 1 to 2 Cubic Yards (45 to 90 bags): A transitional zone. Mixing 60+ bags by hand is physically exhausting and risks cold joints where early batches cure before later batches are poured. Check local ready-mix suppliers for "short load" fees, which may be worth the time saved.
  • Over 2 Cubic Yards: A ready-mix truck delivery is strongly recommended. Most standard truck drums hold 9 to 11 cubic yards, making delivery significantly faster and structurally more consistent.

Practical Pouring Tips

  1. Always Plan for Waste: Running short during a concrete pour creates an emergency cold joint that weakens the slab. A 10% safety margin is industry standard for standard ground slabs; use 15% if the subgrade is uneven gravel or dirt.
  2. Double-Check Form Rigidity: Wet concrete weighs roughly 150 lbs per cubic foot. Inadequately braced wooden forms will bow outward under this hydrostatic pressure, increasing the total volume needed and leaving you short.
  3. Compact the Base First: Excavate organic topsoil and tamp a crushed gravel subbase thoroughly. Uncompacted soil settles after pouring, causing uneven slab thickness, voids, and premature cracking.

When Not to Rely Solely on This Calculator

This calculator assumes a uniform rectangular prism. Do not rely exclusively on basic rectangular math if:

  • Your pour includes integral footings: Slabs with thickened edges (monolithic slabs) require calculating the slab body and edge trenches separately.
  • The site has significant elevation slopes: If your ground drops 2 inches across a 10-foot run, calculating a flat 4-inch depth will leave you substantially under-supplied.
  • Complex structural engineering is required: Retaining walls, multistory columns, and post-tensioned foundations have specific reinforcement displacement and aggregate volume rules governed by local structural building codes.

Comparison

ScenarioInputResult
Lower inputLength: 8Concrete needed: 1.09 yd³
Base exampleLength: 10Concrete needed: 1.36 yd³
Higher inputLength: 12Concrete needed: 1.63 yd³

Common mistakes

  • Forgetting to convert slab thickness from inches to feet before calculating volume.
  • Failing to add a waste margin, leaving the pour short by a fraction of a yard.
  • Measuring the outside of the wooden forms instead of the interior pouring area.
  • Underestimating subbase settling, which increases the required concrete depth.
  • Assuming an 80 lb bag yields 1 cubic foot instead of its true yield of approximately 0.60 cubic feet.

Checklist

  • Measure the inside dimensions of your forms, not the exterior framing.
  • Verify depth at multiple points across the excavated area to ensure uniform thickness.
  • Include an allowance of 5% to 10% for subgrade unevenness, spillage, and form spreading.
  • Decide whether ready-mix delivery or bagged premix is more cost-effective (ready-mix usually requires a 1 to 2 cubic yard minimum).
  • Prepare sufficient water, mixing equipment, and labor before beginning a bagged pour.
  • Confirm local building codes for frost line depth requirements on structural slabs and footings.

Calculators Percentage Editorial Team

Calculator guides from the Calculators Percentage team. These introductory examples are educational, not professional advice.

Last reviewed:

This tool provides structural estimates based on geometric dimensions and standard material yields. Site conditions, ground compaction, and local building codes may affect real-world material requirements.

Frequently Asked Questions

How many 80-pound bags of concrete equal one cubic yard?

It takes 45 eighty-pound bags of concrete to make one cubic yard. One standard 80 lb bag yields roughly 0.60 cubic feet, and there are 27 cubic feet in a cubic yard (27 divided by 0.60 equals 45).

How thick should a standard concrete patio or sidewalk be?

A standard residential walkway, patio, or shed slab is typically 4 inches thick. For heavy vehicle parking or driveways carrying large trucks, a depth of 5 to 6 inches with reinforcing rebar or wire mesh is recommended.

Why do I need to add extra for waste?

Subgrades are rarely laser-level, meaning low spots will consume extra concrete. In addition, wooden forms flex under the hydrostatic pressure of wet concrete, and some material inevitably clings to tools, mixer drums, or wheelbarrows.

When should I order ready-mix concrete instead of bags?

As a rule of thumb, projects requiring more than 1 cubic yard (around 45 eighty-pound bags) are significantly easier and faster with a ready-mix truck delivery. Mixing dozens of bags by hand or with a small drum mixer leads to cold joints if the concrete sets before adjacent sections are poured.

How do I calculate concrete volume for circular footings or post holes?

To calculate a cylinder's volume, use the formula: π × (radius in feet)² × (depth in feet). Divide the resulting cubic feet by 27 to obtain cubic yards, or divide by 0.60 to find the number of 80 lb premix bags needed.

How long does concrete take to cure?

Concrete typically reaches about 70% of its design strength within 7 days and completes its standard curing cycle at 28 days. Light foot traffic is generally permissible after 24 to 48 hours, while vehicles should be kept off for at least 7 days.

Sources & references